• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/24

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

24 Cards in this Set

  • Front
  • Back
  • 3rd side (hint)
Architect works on a
Development Concept.
size & interrelationship of
Interior Spaces
contribute to the Physical,
Visual, Intellectual &
Emotional Comforts of the
intended end-users.
Architectural Interiors (AI)
% of A.I. Work Cost
COST OF WORK =
total cost of all fixtures &
accessories that were installed
in the Project.
Architect's Fee = 15 % (12-20% range)
Consultant's Fee = 5 %
a. Preliminary Design = 30% of the Fee
b. Final Design = 50 % of the Fee
c. Completion of the Porject = 20% of Fee
detailed planning & design
to control sound trans-
mission for compatibility
with Architectural Design
Concept.
Acoustic Design Services
depend on the complexity of the Work
Architect's Fee = 10 - 15 %
detailed planning & design
of Light Transmission,
timing and control for
compatibility with the
Architectural Design
Concept.
Architectural Lighting
Layout & Design
depend on the complexity
of the Work
Architect studies existing
environment in relation to
the building / structure &
consequently lays out the
areas / grounds
immediately surrounding
the building / structure.
Site Development Planning
(SDP) Services
depend on the estimated cost of Civil
Works & Landscaping Works & on the
magnitude & complexity of the Work.
Landscape Design = 5 %
the specialist Architect
provides a multi-dimensio-
nal point-of view to a 2-
dimensional physical plan.
Physical Planning - refers
to the orderly arrangement
of a piece of land or prop.
on which vertical structures
as well as horizontal deve-
lopments are to be
proposed.
Site & Physical Planning
Services (incl. Master Dev.
Planning, Subdivision
Planning & Urban Design)
For Moderately flat terrain
TYPE 1 : 50 hectares or less = 5000 / h.a
TYPE 2: 100 hectares or less = 3000 / h.a.
TYPE 3: 100 hectares or less = 2000 / h.a.
For rugged terrain = + 30 %
concerned with the general quality
Project. c. Diagrammatic Layout of of the settings of the people & their activities,
Construction Systems buildings & other natural and man-made phenomenon.
Physical Planning
* Architects performing the LEAD ROLE.
* In planning for a building, he studies its interrela
tionship with other structures, the surrounding
environment, and their effect & impact on the ne
boring areas.
Specialist Architect - provides a multi-dimensiona
point-of-view to a 2-dimensional physical plan.
based on the concept of
expanded Physical Planning
Services.
covers the range of all
services from Primary Data
Gathering though the
formulation of the MDP &
the parallel preparation of
the environmental impact
assessment / statement
(EIA / S)
CDP Services - Non-physical
or non-engineering compo-
nents of the development
plan.
CDP Components:
1. Physical Component
2. Economic Component
3. Socio-Cultural Component
4. Transport Component
5. Legal & Administrative
Component
MDP Services - Physical
Planning & Engineering
Components of the Deve-
lopment plan.
Comprehensive Development Planning Services (CDP)
Man-months e.g. 22 man-days multiplied
by 8 man-hours, & multiplied by a factor
to cover other direct & indirect costs
(overhead).
research, assessment,
recording, management,
interpretation & conserva-
tion of historical heritage.
Historic & Heritage
Conservation & Planning
arranges & formulates
methods of rating &
ascertaining the value of
structures or facilities which
must be fully kept secured.
Security Evaluation & Planning
methods of producing
building components in a
highly engineered, efficient &
cost-effective manner, parti-
cularly for residential &
commercial applications.
Building Systems Design
provides the Owner with
means & measures to ensure
the proper function & main-
tenance of the building /
structure & site after final
inspection.
Facillities Maintenance Support
recommends the systematic
process of ensuring that a
building / structure's array of
systems is planned, designed,
installed & tested to perform
according to the design intent
& the building's operational
needs.
Building Testing &
Commissioning
Building Environment Rating
System - needed to evaluate
the environmental perfor-
mance of a building & to
encourage market migration
towards Sustainable Design.
a. credit-based
b. flexible
c. consensus-based &
market - driven
International Protocols:
a. Philippine Solid Waste
b. Clean Air & Clean Water Act
c. DENR Administrative
Issuances
Building Environment Certification
scientific study on the built
environment's well-being in
which building / structure can
best maintain itself & prolong
its life in a cost-efficient
manner.
Forensic Architecture
Appraisal - defined as an act
or process of estimating value.
places value on the building /
structure condition & defects
& on its repair & maintenance,
including the required impro-
vements.
Building Appraisal
conceives, chooses & develops
the type, disposition, arrange-
ment & proportioning of the
structural elements of an
Architectural Work, giving due
considerations to safety, cost-
effectiveness, functionality &
aesthetics.
Structural Conceptualization
much more than the basic
knowledge of Site Analysis,
Space Planning & Management
Architectural Programming, &
other services under SPP 201.
Preliminary Services
much more than the basic
knowledge of Specification
Writing, Estimation, & Quantity
Survey, Arch'l Production,
Arch'l Software, Arch'l Support
Services & Contract Document
Review.
Contract Documentation
and Review Services
much more than the basic
knowledge of Pre-Construction,
Construction, Post-Construction,
& other services under SPP 204,
206, and 207.
preparation of the Fire Safety &
Life Assessment Report (FALAR)
required by RA 9514, the Fire
Code of the Philippines & its
2009 IRR.
Post-Design Services
(including Construction
Services)
more than the basic knowledge
of ALTERNATIVE DISPUTE RESO-
LUTION (ADR) prescribed by
RA 9285, the ADR ACT OF 2004
Dispute Avoidance & Resolution
Research Methods, Philippine
Architecture & its History,
Architectural Materials &
Finishes, Building Types &
Standards, Architectural Design
Trends, Architectural Writing &
Architectural Photography.
Architectural Research Methods
Planning & Design Processes for
Housing Developments, Recrea-
tional & Tourism Estates,
Health Care & Hospitality
Facilities, Transportation &
Communications Facilities,
Production & Extractive Facilities
Utility-related Developments,
Secure Facilities, Business &
Industrial Parks, Economic Zones
& Community Architecture & the
like.
Special Building / Facility
Planning and Design
Building Materials & Finishes,
Construction Methodologies,
Building Envelopes including
cladding & roofing systems,
Architectural Fenestrations &
Architectural Hardware,
Fixtures & Fittings.
Building Components
Types of Architectural Office
Operations, Management,
Accounting / Finance / Taxation /
Audit, Labor Code, Architectural
Marketing & Project Development,
Proposals / Negotiations /
Contracts, Contract Administration,
File Management & Limitations of
Business Process Outsourcing (BPO)
& Knowledge Process Outsourcing
(KPO) Operations.
Management of
Architectural Practices