What is the underground rough-in phase? |
A plumber locates all the supply and waste connections from the building system to public utilities, and establishes where these systems will enter or leave the building. |
|
What can be regarded as the fourth phase of plumbing projects? |
Service and maintenance |
|
What tasks does service and maintenance include? |
1. Checking lubrication levels and pumps, test guages and meters 2. Repairing faulty fixtures and components 3. Verifying the operating system 4. Regulating the flow and usage rate |
|
What are the three phases of plumbing? |
1. Underground rough-in phase 2. Above ground rough inphase 3. Finishing phase (Trim-out) |