Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
21 Cards in this Set
- Front
- Back
In test plan tree you want to define a filter for associated test sets as “OPEN”and this is to ensure that only tests that belong to an open test set are displayed |
CROSS |
|
In test plan module when a called test has parameters, then when can you assignvalues to the parameters |
Values are assigned duringtest design or execution |
|
From which tabs in the test lab module can you add tests to test set |
test plan tree tab, requirements tree tab |
|
Deleting the requirement doesn’t delete its child requirement, RT, defectslinkage and hence requests him not to worry |
false |
|
Susan is working on test design related activity in test design relatedactivity in test plan module and she is expected to leverage test configurationto cover multiple req and avoid unnecessary duplications. Given this scenariohow would she achieve this in ALM |
Byassociating different test configuration in the same test with eachrequirement. |
|
. Jamie is the QA lead for a banking based project, during system testingphase he and his team member are expected to perform test execution and posttest result as per the schedule. Test execution was completed by Jaime’s teamand they raised defects against the discrepancies.Franchisewant to witness the test execution log and the results along with testerscontribution in test execution. She logs into ALM and notices that some of therequirements have status as not completed |
None of the test can haveexecution status of BLOCKED. |
|
You are expected to test both functional and non-functional requirements fora project in test plan module |
LR-SCENARIO, QUICK TEST,MANUAL |
|
In requirements module bydefining traceability relationships you cannot add a RTM by dragging arequirement from the requirement tree to the appropriate grid |
False |
|
What does each test set folder to a cycle enable you to do in test labmodule |
Group together test sets thatwill be run during the same cycle and analyze the progress of the cycle as yourun your tests. |
|
Which of the given statement is true regarding progress and summary graphfor defect by status |
Summary graph provides defectcount by status //// progress graph provide accumulation of defects in aproject. |
|
There are 2 methods you can use to conduct a search for similar/relateddefects |
Findsimilar defects and find similar text. |
|
To increase the flexibility and power of a test, you can add ___________to the called test and to the tests that call it |
Parameters |
|
You can add a new defect to a QCproject from any module at any stage of the testing process |
TRUE |
|
Requirement topics are recorded in the requirements module by creating arequirement |
Requirement tree |
|
You can only remove direct links from the linked defects grid. Indirectlinks are removed automatically when the direct links are removed |
Both True |
|
While reviewing and deciding which new defects need to be fixed the QAmanager assigns them to the appropriate |
Release and cycle |
|
In the test plan module which graph enables you to correlate the number oftests and the elapsed time interval |
Test progress graph. |
|
There are 2 methods you can use to create tests from requirements |
Convert requirements to testsand generate a test from requirement. |
|
When a requirement changes, QA alters the affected requirements, thealters can be seen by |
All users |
|
Which module enables you to define graphs and reports |
DASHBOARD |
|
If the QA manager would like to see an overview of status of the testswithin the folder in the test plan tree, which graph would you generate |
Live analysis |