Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
25 Cards in this Set
- Front
- Back
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 003 ?
|
O I AND D LEVEL MAINT/PARACHUTE LOFT REQUIREMENTS
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP004?
|
I AND D LEVEL MAINT COMMON REPAIRS
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 006 09?
|
O LEVEL MAINT ON PCU-58 HARNESS
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 010 02?
|
I and D LEVEL MAINT ON NB-8 PARACHUTE ASSEMBLY
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 016 03?
|
I and D LEVEL MAINT ON NES-14 PARACHUTE ASSEMBLY
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 019 01?
|
O LEVEL MAINT ON NES-12 PARACHUTE ASSEMBLY
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 019 02
|
I and D LEVEL MAINT ON NES-12 PARACHUTE ASSEMBLY
|
|
WHAT IS COVERED IN THE NAVAIR 13-1-6.2 WP 025?
|
I and D LEVEL MAINT ON BA-22 PARACHUTE ASSEMBLY
|
|
The hoist
lines shall be spaced at least ___________ apart |
13-1-6.2 wp003
24-in. |
|
The hoist
lines shall be at least_____in from the wall |
13-1-6.2 wp003
12 in |
|
Ideal conditions are a
temperature of _______and a relative humidity of______ |
13-1-6.2 wp003
24°C (75°F) /60%. |
|
Parachute Record (OPNAV _______)
|
13-1-6.2 wp003
4790/101 |
|
Aircrew Personnel Equipment Record
(__________) |
13-1-6.2 wp003
OPNAV 4790/159 |
|
Technical Publication Deficiency Report
(OPNAV _____) |
13-1-6.2 wp003
4790/66 |
|
VIDS/MAF (OPNAV _______).
|
13-1-6.2 wp003
4790/60 |
|
No parachute
part or restraint harness shall be machine washed more than______ times. |
13-1-6.2 wp004
2 times |
|
Clothes Dryers: Any tumble action dryer that can be controlled so that air temperature does not
exceed ________ |
13-1-6.2 wp004
60_C (140_F) |
|
Parachute parts and
restraint harness shall be machine washed for not more than 10 min. at a temperature not to exceed ________ |
13-1-6.2 wp004
60 _C (140 _F). |
|
PARACHUTE WASHING
After a short time (not to exceed __________.), remove part from tub and allow it to drain as completely as possible. |
13-1-6.2 wp004
10 min |
|
MACHINE WASHING PARA
The suspension lines shall be gathered together every ________. from ends to canopy skirt. |
13-1-6.2 wp004
3-ft |
|
NB-8 PARACHUTE
Using a straight steady pull, observe amount of pull required to remove end fitting from arming cable housing. Allowable force is___________. (QA) |
NAVAIR 13-1-6.2 wp 010 02
17 lbs. ±3 lbs |
|
NB-8 PARACHUTE
Locate gore 28 (__________) and place uppermost in center of packing table |
NAVAIR 13-1-6.2 wp 010 02
nameplate gore |
|
NB-8 PARACHUTE
Maximum scheduled repack cycle is________days for the P-3, C-130, and C-2 aircraft |
NAVAIR 13-1-6.2 wp 010 02
1460 DAYS |
|
NB-8 PARACHUTE
Maximum scheduled repack cycle is _______days for the T-34 aircraft. |
NAVAIR 13-1-6.2 wp 010 02
840 DAYS |
|
NB-8 PARACHUTE
Using the scale, apply a straight steady force to ripcord handle until initial movement of ripcord pins is observed. Maximum allowable force is ___ |
NAVAIR 13-1-6.2 wp 010 02
27 lbs |