• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/7

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

7 Cards in this Set

  • Front
  • Back

HT Relay Subway AUC 207 Numbers


CORE-T

LCC is at booth is booth is within 50 yards of street contact train dispatcher through clerk


OV should be at foot of the stairs to platform 50 yards from LCC


Roof Approx 50 yards from platform stairs


Eng OFF approx 50 yards of line of sight from Roof FF on platform


Truck OFF to fire location


Additional HT equipped member every 100 yards if necessary.


When halting a train with light keep at chest height and wave wide horizontal at least 4ft


Blue light, power removal boxes 20 pound dry chemical extinguisher 600ft away. You have to hold the button to talk and listen on the blue phone.


Gate valves 200ft intervals


Track ID signs on Manhattan bridge are at 400ft intervals and 8’ above vehicle roadway.


EED typically within 50ft of southbound platform end.


EED 7ft, flat on backside and steps on front side weighs 42pounds is yellow and has a 70 degree climbing angle.

AUC 338 Water On Electrical Equipment Numbers

The desired fog pattern for con Ed site 30 degrees or greater Due to wind may not reach the target area from a distance of 15 to 25ft. In theses situations use a straight stream and stand-off distances increased.


Minimum safe operating distances for putting water on energized or De-energized components: Fog (30 degree or greater)


KV 138 FT 15


Strait stream KV 138 FT 75


Fog (30 degree or greater)


KV 345 FT 25


Strait stream KV 345 FT 125



The voltage safe distance


345,000volts 18ft


15,000 - 38,000volts 10ft



When raising aerial ladders and tower ladder buckets, maintain an 18ft safe clearance horizontally from the substation exterior fence.


Transmission substations receive 345,000 volts from generating stations and then step it down to 138,000 volts for delivery to distribution substations.


AUC 207 ADD 7 light train procedures numbers

Light trains are to be used for small fires that can be handled by 1 or 2 extinguishers.


Progress reports from light train shall be at least once every 15min.

AUC 207 ADD 8 Subway ventilation fans numbers

Approximately 200 fan plants in transit system.


Each plant has 1-4 fans, most have 1 fan.


Plants serving under-river tubes may have up to 4 fans.


Each plant has a 4 digit Id.


Individual fans have an air movement capacity of between 50,000 and 300,000 CFM

AUC 207 ADD 9 catenary wires on Amtrak railroad lines

Delivering approximately 12,000 (12kv) volts (AC)


Has 480 volt stand by power operating the refrigeration, lighting, air conditioning,


N.F.P.A fire protection handbook, minimum distance of 4ft for voltages from 10,000 (10kv) to 30,000 (30kv)


Teams applying water with hand held fog nozzle should stay minimum 10ft away from catenary wires.

AUC 207 Add 10 Dry Standpipe in subway stations, sound powered telephones numbers

The dry standpipe will consist of a 4” pipeline with a 3” Siamese


Sound powered telephone box can be opened with a 1620 key.

AUC 207 ADD 12 AirTrain System

There are 10 stations within the airtrain system. 6 stations are located within the central terminal area, and service the 8 existing terminals.


1-4 cars


Each car can carry up to 200 passengers.


Normally travel at 2-4 min intervals during peak hours.


Can reach speeds of 70 MPH


There may be as many as 16 Airtrain running at any given time.


Every train has 4 sets of passenger doors. 2 on each side.


Center walkway located between the two tracks are 5 1/2 ft wide.


Side walkway are located outside of track area are 2 1/2 ft wide.


Side walkways will also be provided with approximately 3 foot heigh handrails.


Airtrain transverses a tunnel on the grounds of jfk that is 1500ft long.


Blue light power removal boxes are located every 800ft along the guideway a RED power removal button inside.


The AirTrain is powered by a Third rail power system 750 volts DC. Members must always step over this and not on it.