• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/32

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

32 Cards in this Set

  • Front
  • Back
Except as authorized, who maintains custody of repair parts?

Supply Officer

Stock replenishment policy is located in what pub and chapter?

NAVSUP P485 Ch 6
Reorder SIM/DBI using Urgency of Need designator ___ and Priority of __?
UND B
PRI 05/06
When a SIM/DBI item has a low cost and low cube, the reorder quantity may be increased to an additional 60 day requirement if the total value of the additional quantity does not exceed what value per line item?
$40
What are AT5 Items?

repair parts which do not compute for storeroom allowances but have application to installed shipboard equipment and are within the ship's capability of ship's force
Use Automatic Reorder Restriction Codes(ARRCs) only for what purpose?


1)Large bulky AT Code 1 material while waiting for a response to an ACR/FCFBR.


2) AT Code 1 Material which has had stock replenishment requisitions canceled with "CG", "CJ", "CK", "CY", or "CU"



Limit Flags are for what purpose?

Valid tools to assist in SIM/DBI management, but its use will freeze the high limit regardless of demand.
The Commanding Officer must sign requests for material with a total cost of what dollar amount?

$5000 or more ($10,000 for LHA, LHD, AOE)
What is Total Asset Visibility(TAV)/Force Inventory Management Analysis Reporting System (FIMARS)?

Assists Force, Group, Task Force Commanders, and Regional Maintenance Centers by providing TAV of inventories on board SNAP I, Ported SNAP, R-Supply, and Micro-SNAP ships because it allows a query all supply systems.
Force Inventory Transmission System Download (FITSDL-Legacy Supply) and Force Drawdown (Optimized Supply) from all ships should be reporting on what dates?

A supplemental/update FITSDL report on the 10th and 25th of each month


A full/baseline report on the 10th day of each quarter

What is the percentage goal for net and gross effectiveness for COMNAVSURFPAC/COMNAVSURFLANT ships?

Net: 85%


Gross: 65%

Process Levels Setting on a monthly basis, between the what days of the month?

between the 1st and the 5th

What is JSI205?

R-Supply Reports Live/Levels Setting Summary Report

What is JSI208?

Trial reorder review

What form is the Allowance Change Request?

NAVSUP Form 1220-2

What is TYCOM percentage goal for repair allowances on hand or on order?

100% maintained for repair allowances

What is LMC?

Local Management Code- two position, alphanumeric code available to establish and regulate critical items of inventory as directed by the TYCOM or higher authority

What is the first position of the LMC?

The converted value of the expiration month. (eg. Jan = 1)

What is the second position of the LMC?

Represents the last digit of the current year

What is the report number for shelf life listing?

JSL322

What is the report number for Material Outstanding File in JCN sequence?

JSL311

The Carcass Tracking Transaction Report (CTTR) shall beconducted by the Supply Officer how often?

weekly

What is an ACR?

Allowance Change Request

Final action on ACRs should not exceed how long?

Three months

Who is the HAZMAT/HAZWASTE Coordinator onboard a ship unless there is an Industrial Hygiene/Industrial Safety Officer?

SUPPO

What is CHRIMP?

Consolidated HAZMAT Reutilization and Inventory Management Program (CHRIMP)

HAZMAT/HAZWASTE guidance is kept in what instruction?

OPNAVINST 5100.19
A maximum of how many gallons of HAZMAT can bestored in a space, unless the space is properly designed and outfitted for storage of flammablematerial.

30 gallons(two 15 gallon approved lockers)

What is CERM?

Casualty Emergency ReplenishmentMaterial (CERM) is for damage control in crisis situations

NAVSUP P-485, para 8131 requires an annual report for all presentation silver setsappraised at what value?

$90,000 or more

The presentation silver report submitted before what date?

March 20th

Do not convert Supply Departmentspaces to another use without applicable approval from whom?

NAVSEA/TYCOM approval