Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
17 Cards in this Set
- Front
- Back
Section I |
Rules for construction of power boilers |
|
Section II |
Materials |
|
Section IV |
Rules for construction of heating boilers
|
|
Section V |
Non-destructive examination |
|
Section VI |
Recommended rules for the care and operation of heating boilers |
|
Section VIII |
Rules for construction of pressure vessels |
|
Section VII |
Recommended guidelines for the care power boilers |
|
Section IX |
Welding and brazing qualification procedures |
|
B 31.1 |
Power piping systems |
|
B 31.3 |
Chemical plant in petroleum refining piping |
|
B 31.5 |
Refrigeration piping |
|
API |
American Petroleum Institute |
|
API 510 |
Pressure vessel inspection code |
|
API 570 |
Piping inspection code |
|
API RP 572 |
Inspection of pressure vessels |
|
CSA B51 |
Boiler pressure vessel and pressure piping code |
|
CSA B52 |
Mechanical refrigeration code |