• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/10

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

10 Cards in this Set

  • Front
  • Back

What are the TIR dates

E1 to E3 = 9 months


E3 to E4= 6 months


E5 to E9= 36 months

What is a valid source for real time information regarding entry opportunities for change in rating

Cway

What milpersman contain methods for changing from one path of advancement to another for a change in rating

1440-010 and 1160-090

Candidates in a rating requiring a clearance must have a favorable investigation issued by who

DODCAF

Wavier for eligibility requests must be approved by who

Navperscom 803

If your exam month is February or March what is your TED

1 July of the same year

If your exam month is August or September what is your TED

1 January of next year

If your exam month is November for E8-E9 advancement what is the TED

1 October of the next year

If the exam month is January and February what is the TED for e7

1 January of the next year

TIR date should be adjusted for time loss in excess of how many days

15 days