• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/98

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

98 Cards in this Set

  • Front
  • Back

What are the 5 steps of ORM?

Identify hazards


Access the risks


Make risk decisions


Implement Controls


Supervising

Which of the following provides detailed procedures for performing maintenance and describes who, what, where, how and with what resources a specific requirement will be accomplished?

MRC

Equipment is placed in IEM status 1 when?

The equipment will not be fully operated for 7 days or more but is fully operational

Equipment should be placed in IEM status 2 when?

The Equipment is inactive and directly subject to corrective maintenance overhaul, or is temporarily transferred to another activity for seven days or longer

The Acronym for 3M?

Material, Maintenance and Management

Who must be notified if a tag is damaged?

Authorizing Officer

What is caution as it appears on the MRC?

Could result in damage to equipment

What is the ship's 3M Manual?

NAVSEAINST 4790.8C

When can maintenance be accomplished with discrepancies?

When the information has been annotated in SKED

During what step do you verify the force revision?

LOEP to Change Page

What does the change page reflect?

Change to a MIP

From last check, when would the next check with a periodicity code of 24M-6 be?

Every 24 Months

What does 3M stand for?

Maintenance, Material and Management

What does 3M stand for?

Maintenance, Material and Management

what is the purpose of the 3M program?

To Provide Maintenance


To Achieve Maximum Equipment Readiness

NAVSEANST 4790.8C is also known as?

3M Manual

NASEAINST 5100.19 is also known as?

Safety Manual

What is NSTM 670 VOL II Also known as?

Hazmat Users Guide(HMUG)

Where can you find the proper Tag out information?

Tag Out Users Manual(TUM)

What is the SPMIG and when is it used?

1. The standard PMS material Identification Guide


2. It is used for location parts, Tools, and materials used for planned maintenance

Who Sponsors the 3M Program?

The CNO

Who has overall responsibility of the 3M Program?

The CO

Who is the system manager for 3M?

The XO

Who is the functional manager for 3M?

The 3M Coordinator

Who is the Principal Assistant to the XO in 3M matters?

The 3M Officer

who is the Principal Assistant to the XO in 3M matters?

The 3M Officer

What is ORM?

It is a decision making tool used by personnel to increase effectiveness and safety by Identifying hazards and managing overall risk?

What are some of the PITFALLS OF the ORM Process?

1. Prejudice


2. Inaccuracy


3. Over Optimism


4. Alarmism


5. Indiscrimination

For Junior Personnel what ORM IS most important?

Time Critical

What does CSMP stand for and what is its purpose?

Current Ship's Maintenance Project Report. Used to show the status of a JOB in the System

Who is responsible for the operation of the 3M program within the workcenter?

The Work Center Supervisor (WCS)

What is SOH and who manages it?

Safety Occupational Health. Managed by Safety Officer

Which Chapter in the safety Manual(5100.19E) is Basic Safety

Chapter C1

What is an MRC? And What is its purpose?

Maintenance Requirement Card.


Shows the WHO, WHAT, AND WHERE on specific maintenance and whats required for its completion

What is a MIP? And What is its purpose?

a) Maintenance Index Page


b) Used to list ALL of THE MRCs within a workcenter

When can maintenance be accomplished if there is a discrepancy?

Once the discrepancy is noted in SKED

What does the letter in a SYSCOMNUMBER mean?

Y: Repair Parts Required


N: Repair Parts Not Required

What does the middle set of numbers in a SYSCOM number mean?

Library Code Number

What does the first set of number in a SYSCOM number mean?

Date of Current Revision

What is a Caution Tag?

Provide Special Amplifying Instructions that must be followed when operating equipment

How do you validate an MRC?

verity MRC to MIP


verify MIP to LOEP


Verity LOEP to change page

How often is a Maintenance Periodicity Code of 24M-6R Required?

Every 2 Years (24 months)

Who Reviews and Approves weekly PMS?

The DIVO

What Signifies Required Items for a 2 Kilo on O ONMMS-NG

Those with Red Check Marks

What is IEM?

Placed when reduced Maintenance is Required due to inactivity

What is IEM status I?

When Equipment is inactive for<7 days or>7 days but fully operational

What is IEM status II?

When equipment is inactive due to corrective maintenance, overhaul or is temporarily transferred to another Activity for>7 days

What does * mean on a MRC?

Required Safety of Ship

What does the # Indicate?

Mandatory Related Maintenance

What is the purpose of the change Page?

Shows Changes to A MIP

What is the max time between safety inspections

One Year

What is the difference between Warning and Caution?

WARNING: Injury to personnel


CAUTION: Damage to equipment

What is the purpose of out of Calibration Label?

To Identify instruments that no longer read within the correctly calibrated parameters

Which document provides a listing of MIPS assigned to a work center?

The LOEP

What Actions Are Required if an imminent danger situation exists?

The Senior Person Must be notified and must stop all work immediately except in an operational emergency. Notify the CO and take action ASAP

where can you find specific info on PPE for Hazmat?

HMUG ( Hazardous Material User Guide)

When can you skip a step in the MRC Process?

If there is a note or if applicable

Where can you find required maintenance for a particular work center?

PMS Manual

Who maintains the 13 Week Report

WCS

When does Asbestos become a health hazard?

When Punching, Grinding, Machine, or Sanding

A MRC has the total Man hours as 0.4, how many minutes is that?

24 minutes(60×0.4=24 Minutes)

Calender Periodicity D

Daily

Calender Periodicity W

Weekly

Calender Periodicity M

Monthly

Calender Periodicity Q

Quarterly

Calender Periodicity S

Semiannually

Calender Periodicity A

Annually

Non Calendar periodicity R

As Required

Non Calendar Periodicity U

Unscheduled

IEM- Inactive Equipment Maintenance LU

Lay Up

Non Calendar Periodicity PM

Periodic Maintenance

Non Calendar Periodicity SU

Start Up

Non Calendar Periodicity OT

Operational Test

The WCS is allowed to lend someone their OMMS-NG Username without giving them their LAN Password, True or False?

True

who signs a Danger Tag First?

The Authorizing officer

If a question exists regarding a step in a maintenance requirement, the maintenance person should?

Immediately Contact the WCS

A Caution Tag is used whenever?

Precautionary Measures, to provide temporary special instruction as needed

What are the duties/ responsibilities of the second person on an equipment Tag out procedure?

To verify proper Tag Attachment and positioning of switch/valve

What form is used to report discrepancies/deficiencies in the PMS System?

OPNAV 4790/78

What does 2W Mean?

Every Second Week

A work center can take credit for PMS check if how many percent of the check is completed?

100%

What are the three types of ORM Controls?

Administrative Control


Physical Control


Engineering Control

The Division LCPO Reviews and initials which line out?

MIP or LOEP

How can you check the status of ordered parts?

Go to work Candidate and Check the status of parts

What is a SCAT Code?

A Code used to identifying PMS to be completed

How many type of CASREPS are there?

4

What does the word CASREP Mean?

Casualty Report

What is chapter C9 in the afloat safety manual?

Electrical Safety

Where do Maintenance Personnel find their PMS Assignments?

Accountability Log

What is chapter C1 in the Afloat Safely Manual?

General Safety

What is required to be displayed on an unlabeled Hazmat container...

Material Name,


Manufacturer Name and Address


Nature of Hazard

During which step is the force revision verified?

LOEP to Change Page

Which lays out more specific/ Technical Guidelines: HMUG or MSDS?

MSDS

which lays at additional PPE, controls and precautions for Hazmat?

HMUG

What does TORS stand for?

. TAG OUT RECORD SHEET

What is the color of a classified MRC

Pink

when do you operate equipment with a danger TAG?

Never

What is EIC?

Equipment Identification Code