16 Cards in this Set

  • Front
  • Back

3M meaning

Maintenance and Material Management

Who's job is it to ensure pms covers all maintenance worry equipment in the workcenter.

Work center supervisor

Who maintains an accurate list of effective pages

Work center supervisor

Who ensure 3-M system work center files and publications are complete, current and available to the work center personnel?

Work center supervisor

Who ensures equipment changes, weather adds and removals are reflected in the configuration database and, if not, reported via 4790 / CK to the configuration data base manager CDM?

Work center supervisor

When should the work center supervisor ensure the back reports are submitted?

A. when errors are believed to exist


B. Entries in the tools parts material and test equipment block are wrong or inadequate.


C. The MRC will cause a hazardous condition.


Who does the work center supervisor provide line-outs and a list of non applicable our checks for review to?

Leading chief petty officer and leading petty officer

Who reviews and verify the content and validity of PMS and feedback reports within 3 days of origination?

Leading chief petty officer

Who insures the divisional current ships maintenance program is accurately reflects the material conditions?

Leading chief petty officer

Who conducts quarterly self-assessments as directed by the 3M office and promptly correct deficiencies?

The leading chief petty officer

Who review approved and closes out weekly schedules

Leading chief petty officer

Which accomplishment is critical for maintaining equipment in a ready state and achieving expected service life

Maintenance requirement card

What are PMS dates codes for october-november and December

C December.


B November.


A October.

What are non-calendar periodicity codes

Situational requirements, unscheduled maintenance, assessment procedure

What is the periodicity code for situational requirements

R

What does in situational requirements / our check means

When the ship or department or piece of equipment goes through a specific evolution.