Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
16 Cards in this Set
- Front
- Back
3M meaning |
Maintenance and Material Management |
|
Who's job is it to ensure pms covers all maintenance worry equipment in the workcenter. |
Work center supervisor |
|
Who maintains an accurate list of effective pages |
Work center supervisor |
|
Who ensure 3-M system work center files and publications are complete, current and available to the work center personnel? |
Work center supervisor |
|
Who ensures equipment changes, weather adds and removals are reflected in the configuration database and, if not, reported via 4790 / CK to the configuration data base manager CDM? |
Work center supervisor |
|
When should the work center supervisor ensure the back reports are submitted? |
A. when errors are believed to exist B. Entries in the tools parts material and test equipment block are wrong or inadequate. C. The MRC will cause a hazardous condition. |
|
Who does the work center supervisor provide line-outs and a list of non applicable our checks for review to? |
Leading chief petty officer and leading petty officer |
|
Who reviews and verify the content and validity of PMS and feedback reports within 3 days of origination? |
Leading chief petty officer |
|
Who insures the divisional current ships maintenance program is accurately reflects the material conditions? |
Leading chief petty officer |
|
Who conducts quarterly self-assessments as directed by the 3M office and promptly correct deficiencies? |
The leading chief petty officer |
|
Who review approved and closes out weekly schedules |
Leading chief petty officer |
|
Which accomplishment is critical for maintaining equipment in a ready state and achieving expected service life |
Maintenance requirement card |
|
What are PMS dates codes for october-november and December |
C December. B November. A October. |
|
What are non-calendar periodicity codes |
Situational requirements, unscheduled maintenance, assessment procedure |
|
What is the periodicity code for situational requirements |
R |
|
What does in situational requirements / our check means |
When the ship or department or piece of equipment goes through a specific evolution. |