Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
48 Cards in this Set
- Front
- Back
Who is the primary sked 3.2 user? |
WCS |
|
What instruction states that a matinence person must show they are quelled during a spot check? |
Comnavair 4790? |
|
Hiw long do you have to keep ACNs and FBRs in the 43P1? |
Untill they are implied in the force revision? |
|
What is the deadline date for the 4790.2K? |
N/A it is optional |
|
What is the accomplishment rate for completed maintenance? |
P A R |
|
What is the administration ralle? |
S C A R |
|
What is referred to as level of effort? |
Man hours |
|
How long before TFBR is sent off the ship? |
7 days |
|
What do line out in red mean? |
Unapproved |
|
What do lineouts in blue mean? |
Approved |
|
What do you not do when you get new equipment? |
COSAL FBR |
|
What instruction do you use for hazmat? |
NSTM 630? |
|
How fast do you get preliminary reports back for a UFBR? |
72Hrs |
|
What do you use a split mip for? |
2 divisions working on the same item |
|
How long can you check out hazmat? |
24hrs |
|
What make up the tagout binder? |
TUMS, Active tags, cleared tags |
|
How many types of revisions are there? |
5 |
|
Scheduling aid on the MIP are used for DL except? |
Preparation of COSAL FBR submission to Tycom |
|
Which of the following is not required when new equipment is placed on boxes not covered by PMS? |
Add new equipment through SOMS requesting part support |
|
Who is responsible for for approving the WC schedule after creation or administrative changes are made? |
Department head |
|
Each MRC not X'd off will be justified by what? |
Flip page / check note |
|
What identifies the proper Hazmat required for an individual MRC? |
The SPMIG |
|
Urgent technical FBR's are filed when? |
PMS descrepency could have detrimental effect on equipment, personal safety, or could result in equipment damage. |
|
What is the correct date format for all 3M documents? |
DDMMYYYY |
|
What must a WC submit when there is a descrepency that are within the divisions capability but cannot be corrected by the division within 30 days? |
Originating WC TA 4 JSN |
|
Who is the primary zone inspector manager and responsible for reporting completion to D3MA? |
WC |
|
Which instruction states the technician has to be fully qualified for a spot check? |
4390.8C |
|
Advance change notice and FBR are retained in the 43P1 for how long? |
untill the revision document is received |
|
Who is overall responsible for the execution of the zone inspection program? |
CO |
|
What sked 3.2 accomplishment rating tracks R checks? |
SAR |
|
What accomplishment rating details MRCs completed within periodicity? |
PAR |
|
Authorization of red tag |
Not authorized |
|
Department head ensures the D3MA, DIVO and WCS are what? |
Fully qualified and designated in writing. |
|
What does a red line in sked 3.2 mean? |
Not approved |
|
What are scheduling aids on the MIP used for? |
Preparation of COSAL FBR for submission to TYCOM |
|
Who ensures all equipment for the work center has all the correct pms coverage? |
WCS |
|
Deferred maintenance requires for all but... |
An addition of new equipment or system |
|
What periodicity symbol indicates safety of ship item? |
Asterisk |
|
What do you not do if you find a danger tag out of place? |
Continue working |
|
What is required for a modification of inuse equipment? |
43P1/CK |
|
... sheets are maintained for how long? |
1 year |
|
In sked 3.2 what accomplishment rating gives details acknowledging PMS alerts |
AAR |
|
What is some times referred to as the TL code in OHMS? |
Availability code |
|
Each maintenance marked lost, N/A will have what added to the schedule? |
Check note |
|
TFBR are approved and sent off the ship in how many days? |
7 |
|
A Blur line out indicates what? |
Approved |
|
Who reviews 13 week reports prior to starting and at the end of the week? |
Divo, LCPO, WCS |
|
A maintenance person is responsible for Hasmat IAW what instruction? |
NSTM630 |