- Front
- Back
-explain the fundamentals of a tent camp layout in relation to the following.
-latrine from galley -latrine from water supply -garbage pit from water -garbage pit from galley |
-latrine from galley 100 yds
-latrine from water supply 100 yds -garbage pit from water 100 yds -garbage pit from galley 30 yds |
|
-discuss the purpose of leach fields
|
-used to dispose of grey water into the ground using 4" to 6" perforated pipe.
|
|
-discuss the following as it pertains to camp maintanance
-trouble desk -three types of work -operator inspection -control inspections |
-trouble desk: recieves all customer service calls.
-3 types of work: emergency service work- all work requiring immidiate action and requires less than 16 man hours and less than $100 in material cost. specific job order- is a job that will take more than 16 man hours. standing job order- a large job that takes more than 40 hours to complete. -operators inspection: preformed by the operator of the equipment -control inspection: review of camp facilities to determine necessary maintanance during a deployment. |
|
-discuss potable water, chlorination, and super chlorination
|
-potable water: satisfactory for drinking
-chlorination: residual chlorine of 2PPM -super chlorination: 100 PPM |
|
-discuss the three parts of the ABFC system and explain their relationship
|
-component site plan: a group of personnel and material that has a specific function or mission at and advanced base (NMCB)
-facility drawing: lists and describes by assembly number the assembly requirement for each facility. (250 man tent camp) -assembly drawing: lists line item requirements by NSN for each assembly (tent 16X32) |