Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
17 Cards in this Set
- Front
- Back
How many men can the LRU-14/a carry?
|
12 man
|
|
Were are the topping off valves located?
|
upper tube
each main tube inflatable seat inflatable floor section |
|
The inflation assembly inflates what?
|
main tube only
|
|
After boarding what do you inflate with the topping off valve with hand pump?
|
upper tube
seat floor sections |
|
The inspection cycles for the LRU-14 is what?
|
P3 365
All others 224 day |
|
Rip cords are tacked where?
|
First middle and last one turn size E single
|
|
The functional test the LRU-14 should inflate in what amount of time?
|
1 min
|
|
Remove pull cable from valve and apply_______pull force between cable ball and snaphook.
|
50-lb
|
|
During the visual inspection you inflate the LRU-14 to what?
|
1.0psig
|
|
The cylinder should be charged to what?
|
4.80 +- 0.06 lbs
|
|
Tighten coupling nut to raft inlet manifold to a torque value of what?
|
145+-5 in-lb
|
|
The LRU-14 bow and stern leak test is what pressure?
|
2.0 max
1.6 min |
|
The LRU-14 upper tube floor and seat pressure is what?
|
1.0 max
0.60 min |
|
Tighten inflation valve onto cylinder and tighten to what torque?
|
135 +- 10 ft-lb
|
|
Tighten safety plug to what?
|
29 ft-lb
|
|
Supply cylinders not equiped with siphon tube must be what?
|
inverted
|
|
Tighten discharge port to a torque of what?
|
60+-5 in-lb
|