Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
14 Cards in this Set
- Front
- Back
2U PERS WAR
|
2 alarm or greater to staging area
Utility companies called: Electric, Gas & Water Police for traffic & crowd control EMS for fire & occupant treatment/transport Rapid intervention crew Safety Officer Water supply officer Accountability Officer Rehad officer |
|
SS PRIDS CO
(Fires Under Control) |
Secondary search
Salvage/Overhaul Personnel Accountability Roll Call Rotate/Rehab of members Investigation of fire Demobilize the incident scene Secure scene Check for CO levels before allowing occupants in Owner/representative gets bldg. back |
|
Ladder Co. AL VES SCOUP
|
Apparatus placement
Laddering of bldg. Ventilation Entry(forcible) Search Salvage Coordinate with other companies/command Overhaul Utilities shut down Progress reports to command |
|
Engine Co. WASS POCC
|
Water supply est.
Apparatus placement Select size hose to be used Stretch hose line Placement of hose line Objectives of hose line Coordinate with other companies/command Command receives progress reports |
|
coal twas wealths
|
construction
occupancy apparatus & manpower life hazard terrain water supply auxiliary appliances street conditions weather exposures area & height location & extent of fire time hazardous conditions special considerations |
|
CBRNE
|
chemical
biological radioactive nuclear explosive |
|
LUNAR |
location unit name or number assignment/air supply resources needed |
|
REAL MOS for structural collapse |
-Rescue Company -EMS personnel (additional) -Additional Alarms (at least one to scene and one to staging) -Lighting for extended operations -Mask service unit/air supply -OEM help get heavy machinery for lifting debris -Structural Engineer |
|
Search for victims in collapse |
1) Secure area 2) Survey and preform size up 3)Shut off utilities 4) surface victims search and removal 5) search voids and crevices 6) Call a time out in order to withdrawal and perform safety size up 7) Tunnel And trench to reported buried victims 8) General debris removal 9) Be aware of fires, gas leaks and secondary collapse while doing steps 1-5 |
|
VEIS |
Vent Enter Isolate (ex. Close door of bedroom) Search |
|
1st company officer on scene SLICE-RS |
Scene size up Locate the fire Isolate the flow path Cool from a safe location Extinguish
Rescue Salvage |
|
TD DOP (terminating command) |
Transfer/Terminate command Debriefing
Document/reports Offer CISD Post incident analyst |
|
V V D C (4 parts to art of reading smoke) |
Volume, velocity, density and colour. |
|
RECEO VS |
Rescue Exposures Confinement Extinguish Overhaul Ventilation/Salvage |