Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
51 Cards in this Set
- Front
- Back
The amphibipus assult ship crash crane (AACC) is capable of lifting how many pounds? |
70,000 |
|
The max gross vehicle unloaded operating weight of the AACC is? |
90,000 |
|
The AACC engine operates at how many RPM? |
1,800 RPM |
|
The AACC engine requires what fuel type? |
JP-5 |
|
The wheels of the AACC are ________ type. |
29" multi-piece flange |
|
The maximum load capacity for the AACC inrigger is? |
110,000lbs |
|
The primary source of dc power for the AACC is? |
Two 12 volt batteriea |
|
Crane speed is limited to________ during pendent use. |
1mph |
|
The boom od the AACC is how long? |
46' |
|
Boom up and down is achieved by what? |
Luffing control |
|
The main hook can rotate a maximum of hours many degrees? |
360 |
|
A tag line system is used to achieve what? |
Load stabilization |
|
The reeving group is made up of what? |
Wire rope used on the crane Virtical lead sheave Spreader assembly |
|
Wire rope should be replaced when? |
More than one broken wire in one lay of rope |
|
Shipboard crash and salvage units should maintain a total number of ___ fabric hoisting slings |
8 |
|
The lifting eye of the fabric-hoisting sling is made up of? |
5/16-inch steel plate |
|
A suggested safe-working load limit is _____ of the breaking strength of new nylon tape |
50% |
|
Wire rope is generally manufactured from? |
Plow steel |
|
Aircraft being taxied from the line require how many directors? |
1 |
|
An aircraft being taxied on land within 25 feet of an obstriction require how many safety observers? |
2 |
|
As a minimum on shore bases, tow crews are comprised of how many pwrsonnel? |
4 |
|
Before towing an aircraft the director should do what? |
Make sure the ground safety locks are installed |
|
What will determine how the aircraft should be towed? |
The weather |
|
During aircaft hot refueling wjat ahould be standing by? |
TAU-2 |
|
Who is the overall supervisor of the flightdeck on an aircraft carrier? |
FDC |
|
The FDC conducts what? |
The prelaunch briefs for plane directors |
|
The flight scheduals are prepaired by what department? |
OPS |
|
The flight schedual gives what? |
Launch and recovery times Number Type Squadron |
|
Who makes the final decision on which aircraft will make the schedualed launch? |
ACHO |
|
Aircraft being directed on the catapult should not exceed how many knots? |
4 |
|
Down aircraft should be parked where? |
In the hanger bay |
|
Errors of distance and judgement usually occur when? |
Night ops |
|
The major objective of safety precautions is? |
To prevent mishaps |
|
Maintenance and operational spotting concern who? |
Hanger deck hamdling crews |
|
On an LHA, both aircraft elevators can handle |
A max load of 38,000lbs |
|
The nose wheel of a CH-46A can swivel |
360 degrees |
|
The function of the aircraft rescue team is |
Effect the rescue |
|
The department or organization responsible for aircraft salvage is |
Identified in the pre-mishap plan |
|
Aircraft mishap board has |
The authority to investigate |
|
Who represents the command in the even of an off-station aircraft mishap? |
Judge advocate general |
|
A cat 1 airfeild crash crane ahpuld arrive at the scene of a mishap within a max of? |
15 mimutes afyer notification |
|
What shpuld be maintaind at all times during flight ops? |
The stamdby alert |
|
When shpuld hot drills simulating aircraft emergencies be condocted? |
Bimonthly |
|
What are the two types of communocatiom systems that are installed in emergemcy vehicles? |
Portable amd mobile |
|
What is an audit? |
Periodic or special evaluation of details conducted by QA |
|
Who is ultamitely responsible for the quality of materiala used to perform maintenance? |
The CO |
|
What is the work center supervisor responsible for? |
Making sure quality workmanship is attained |
|
Receiving amd screening inspections apply to |
Material Parts And equipment |
|
In-progress inspections are conducted when? |
Task performance cannot be determined after the task has been completed |
|
QA conducts |
Final inspections |
|
QA inspectors sign the |
Inspected by block on all MAFs |