What is defined as any piece of equipment sub equipment system or subsystem requiring maintenance ? |
Maintenance Item |
|
Work Center Supervisors shall use what view of SKED 3.2 to manage their Work Centers |
WORK CENTER |
|
Who can authorize the splitting of a MIP if an MRC requires another Work Center to completely perform the MRC ? |
XO |
|
In the Procedure block , may line out the non - applicable line items alternate procedures that do not pertain to current equipment configuration words " if applicable or a note identifying steps to be omitted ? These items must be reviewed and when the step includes the approved by |
WCS LCPO |
|
Work Center or equipment changes will be reported in the OMMS system using what ? |
OPNAV 4790 / CK |
|
What is the 4 - character number assigned by the Work Center to a maintenance action , or assigned by the outside activity performing the work ? |
JSN |
|
In SKED 3.2 , what organizes Maintenance Items under like categories ? |
Maintenance Groups |
|
What are the two types of Technical Feedback Reports ? |
Routine, Urgent |
|
Inactive Equipment Maintenance that falls under Status 1 is defined as? |
Equipmet that will remain on board,is not scheduled for corrective maintenance or overhaul and will be inactive for seven days or longer. |
|
SKED 3.2 uses what display for supervisors to forecast man hours tools parts and test equipment ? |
FORECAST DISPLAY |
|
True or False.In SKED 3.2 when Supervisors add or reschedule PMS , future occurrences of the check will adjust accordingly to maintain proper periodicity |
True |
|
In SKED 3.2 what display provides PMS history for all Maintenance Items in a Work Center and provides the next schedule date in which maintenance should be performed again? |
REVIEW DISPLAY |
|
—— is the functional manager of all of the 3 - M administrative and its System facets of the 3 - M System program responsible to —— for the coordination and direct supervision |
3MC, XO |
|
Who is accountable to the Division Officer for the proper operation of the 3 - M System within their division ? |
LCPO/LPO |
|
What form is a maintenance action ? used to provide amplifying information ( such as drawings and listings ) related to |
OPNAV 4790 / 2L |
|
Written permission from the ———, or higher authority , is required to place any system or individual piece of equipment into IEM . |
Dept head |
|
All line outs and additions to the LOEP, MIPS, MRCS and Situational Reference Sheets must have appropriate justification . What is appropriate justification ? |
Scheduling Aids, fully approved FBR, alternate Work Center, .D all of the above |
|
What is required for work centers to line - out all MRCs on a MIP , except for the U , SU , LU , PM , or OT checks ? |
Approved FBR |
|
What are the three types of spot checks ? |
historical , maintenance validation , and monitored maintenance . |
|
How often will the 3MC ensure that a self - assessment is completed ? |
Quarterly |
|
Collaborative Maintenance events occur when ? |
MR requires another work center's respurces to complete. |
|
Collaborative Maintenance events occur when ? |
MR requires another work center's resources to complete. |
|
What symbol following the periodicity code indicates a Safety of Ship item ? |
* |
|
What symbol following the periodicity code indicates that this procedure is intended to be scheduled and performed by Off - Ship Maintenance Personnel ? |
+ |
|
What is the Ships 3M Manual ? |
NAVSEAINST 4790.8C |
|
Maintenance personnel shall check the view upon each use of SKED , which is customized to user role and place in the chain of command . Personnel are responsible for performing maintenance tasks that are assigned to them and can determine assignments from the view |