Who is the functional manager of the 3-M
System and is responsible to the Executive Officer for the coordination and direct supervision of all administrative facets of the Ships' 3-M System program? |
3-M System Coordinator
|
|
Who Reviews and approves the quarterly schedule & ensures the
divisional quarterly schedule is updated weekly. |
Division Officer
|
|
Who maintains the PMS Master File?
|
3M system coordinator
|
|
Identify the meaning of the following Periodicity Code
9M? |
Every 9th month
|
|
Identify the meaning of the following Periodicity Code
2W |
Every 2nd week
|
|
Identify the meaning of the following Periodicity Code
3D? |
Every 3rd day
|
|
Identify the meaning of the following Periodicity Code
2D? |
Every 2nd day
|
|
Identify the meaning of the following Periodicity Code
Q? |
Quaterly
|
|
Identify the meaning of the following Periodicity Code
S? |
Semi annually
|
|
Identify the meaning of the following Periodicity Code
A |
Annually
|
|
An asterisk (*) following the periodicity code
indicates what? |
Safety of Ship item and requires the
ship/or user to comply with reference (e). |
|
With in IEM PM means what?
|
Periodic Maintenance
|
|
With in IEM OT means what?
|
Operational test
|
|
With in IEM LU means what?
|
Lay up
|
|
With in IEM SU means what?
|
Start up
|
|
MRC’s with mandatory
related maintenance should use the same EGL’s to coordinate completion. T/F? |
True
|
|
The only modifications which shipboard personnel may
make to the MRCs are what? |
Tools, Parts, Materials, and Test Equipment.
|
|
This displays the planned
maintenance requirements to be performed over long periods of time in the maintenance life cycle of the ship? |
The Cycle PMS Schedule
|
|
A shore command’s PMS Cycle shall be how long?
|
20 quarters
|
|
What displays the Work
Center's PMS requirements to be performed during a specific 3- month period? |
The Quarterly PMS Schedule
|
|
A printed Quarterly schedule with Division Officer’s
signature and date IS NOT required when using SKED. T/F? |
True, The Division Officer finalizing the schedule
constitutes the approval signature. |
|
This serves as a directive for Work Center Supervisors for scheduling weekly maintenance?
|
Use of the Quarterly PMS Schedule
|
|
The Weekly PMS Schedule must be updated with the status of
Maintenance Requirements. How do you indiciate the maintenance has been fully accomplished? |
X
|
|
The Weekly PMS Schedule must be updated with the status of
Maintenance Requirements. How do you indicate that the maintenance is Not fully accomplished? |
O
|
|
This is A 4-character entry composed of the last digit of the calendar
year followed by the numerical day of the year (e.g., 1 January 1994 is "41" and 31 December 1993 is "3365"). |
Julian Date
|
|
What type of FBR deals with safety related issues?
|
Urgent
|
|
Special tools required for maintenance actions are listedon what?
|
tools parts and materials block of the mrc
|
|
On the cycle schedule how are additional MIP line items displayed?
|
By location and EGL
|
|
IAW the Joint Fleet Maintenace Manual the maintenance person must prove they are fully qualified to perform the MRC during a Spot Check? T/F?
|
True
|
|
Who is responsible for scheduling weekly PMS and supervising its accomplishment?
|
Work Center Supervisor
|
|
When reviewing the quarter Schedule the # R-1 of S-1(#R-1) denotes what
|
R-1 is mandatory for the completion of S-1
|
|
Situation requirements are documented on the font of the quarterly board when?
|
After the MRC is accomplished
|
|
Instructions for the preparation of a PMS feedback reports are found on the revers of OPNAVIST 4790/7B green page? T/F
|
True
|
|
What provides detailed procedures for performing maintenance requirements?
|
MRC
|
|
Start up maintenance action prepared the equipment for periods of prolonged idleness and are usually performed only once at the beginning of the inactive period? T/F
|
True
|
|
The calendar located at the top of the Quarterly board is used to determine what?
|
Underway Periods
|
|
On the quarterly schedule how do you indicate start and stop of IEM?
|
Draw a vertical line in red all affected MIPS
|
|
A vertical RED line drawn on a MIP located on your cycle board represents what?
|
The start and stop or IEM periods
|
|
What person is authorized to certify that a closed space is safe to enter?
|
Gas free engineer
|
|
What are the three types of feed back reports?
|
Category A
Category B Urgent |
|
You should resubmit a feed back report if is over how many years old?
|
1 year
|
|
Technical review activities of urgent FBR provides a preliminary response to the orginator with in how many days?
|
1 working day
|
|
Who is the commands 3M manager?
|
XO
|
|
Advance Change Notices (ACN) and PMS Feedback Reports (FBR) are retained in the 43P1 for how long?
|
Until revision documentation is received
|
|
Equipment in IEM that is directly subject to corrective maintenance overhaul or removal for safe storage replacement is classifies as what status?
|
Status II
|
|
What type of maintenance action ensures that equipment is in a condition suitable for operation or to reactivate an equipment of system that has been inactivated for a prolonged period?
|
Lay up Maintenance (LU)
|
|
What OPNAVIST provide guidance for 3M policies and procedures?
|
4790.4C
|
|
What are the three components of a JCN job control number?
|
UIC-WC-JSN
|
|
Superseded Cycle schedules will be kept for how long?
|
1 year
|
|
What was developed to reduce PMS requirements during overhauls, availabilities and other extended periods of equipment inactivity?
|
IEM
|
|
Quarterly schedules begin on the firs Monday of _____?
|
January, April, July & October
|
|
A maintenance person is responsible for all Hamat PPE IAW?
|
HMUG & the MSDS
|
|
What are the three components of a JCN job control number?
|
UIC-WC-JSN
|
|
The purpose of the CSMP is what?
|
To provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship
|
|
Superseded Cycle schedules will be kept for how long?
|
1 year
|
|
Who is responsible for reviewing signing and dating of the weekly schedule?
|
Divo
|
|
What was developed to reduce PMS requirements during overhauls, availabilities and other extended periods of equipment inactivity?
|
IEM
|
|
Who approves the Cycle Schedule?
|
Dept Head
|
|
Quarterly schedules begin on the firs Monday of _____?
|
January, April, July & October
|
|
When conducting a spot check the maintenance person must present all correct tools parts materials and test equipment IAW what reference?
|
SPMIG
|
|
A maintenance person is responsible for all Hamat PPE IAW?
|
HMUG & the MSDS
|
|
A ( / ) on the LOEP denotes MIP issued and not as part of the force revision t/f?
|
True
|
|
The purpose of the CSMP is what?
|
To provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship
|
|
Who is responsible for reviewing signing and dating of the weekly schedule?
|
Divo
|
|
Who approves the Cycle Schedule?
|
Dept Head
|
|
When conducting a spot check the maintenance person must present all correct tools parts materials and test equipment IAW what reference?
|
SPMIG
|
|
A ( / ) on the LOEP denotes MIP issued and not as part of the force revision t/f?
|
True
|
|
What does CSMP stand for?
|
Current Ships Maintenance Project
|
|
Who is responsbile for rescheduling any circled requirements still within periodicity and for determining the reason for a maintenance action not being accomplished?
|
Divo
|
|
What windows application automates the PMS scheduling process generates Cycle Quarterly and Weekly schedules as well as EGLS TGLS and ACFs?
|
SKED2
|
|
What type of maintenance action must be accomplished on a recurring basis during the inactive period to prevent equipment deterioration?
|
Operational Maintenance
|
|
What is used to provide amplifying instructions to a Work Candidate?
|
4790/2L
|
|
When and where should you document Situation Requirements?
|
On the front on the Quarterly Board after the MRC has been accomplished.
|