• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/37

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

37 Cards in this Set

  • Front
  • Back

what happened to the USS thresher and when

piping failure April 10 1963

when was the SS Challenger accident?

jan 28 1986

USS IWO JIMA accident date

OCT 30 1990

What does QA ensure?

provides procedures and guidance to ensure with a reasonable level of confidence the work preformed on navy ships is accomplished with first time quality

What are the two types of a DFS?

Major-departure that affects preformance,durability,reliability




must be approved by NAVSEA or tycom




Minor- must be approved by tycom or ISIC

What is the form for a dfs?

QA form 12

What two ways can a dfs be approved?

permanant or temperary

all dfs for submarine must be approved prior to what?

going underway

FME shall be

Fire resistant


no brittle


non melting


no tearable

covers and plugs of fme will be made of what?

rubber, metal, ridgid plastic

what must a controlled job site be marked

physical barrier


marked sign

when may a controlled material not have a QA tag?

on a CWS

A fwp must contain the following?

material


initial conditions


procedure


test and inspections


system restoration




May also include


loep


general info


responsibilities


precautions

FWP must be approved by who?

PEO planning and estimating officer


LWC lead work center sup


AWCS assistant wcs


awc div officers


repair officer does final review before he approves it for oppening

CWP is...

same as fwp but with additional steps


must be approved by qa officer prior to repair officer

maintenance certification record re entry control form is what qa form?

QA form 12



cwp=?

fwp+oqe



rivision criteria for FWP/CWP?

scope of work changes


bountry of work changes


change in test requirements


change in material requirements


if radcon is insufficient


mcr/rec revised



what block and form must the craftman verifies is signed?

block 15d of the QA form9

QA form 2

non nuclear material id tag

qa form 3

controlled material reject tag



qa form 11

cwp/rec log



qa form 17

test and inspect record



QA FORM 34

joint conponent torque assembly record

what are the tourque criterias?

breaking


running


required


final

rework is defined as?

the unplanned repitition of a step in a FWP



who does the wcs take a problem to if there is a disprepensy in the FWP?




who assigns the addendum serial number and who signs it?

planning and estimating (R-7)-to create rework addendum




R-8


div-o for fwp


PEO and QAO for CWP

R margin sybols


S


C


I


CI


Q
V
G

(R) radiological


(S)ships force


(C)cleanliness


(I) QAO or NDT


(CI) RCI reactor cleanliness inspector


(Q) critical quality control points


(V) verification by craftsman


(G) government notification required



what are q points?

quality control points, require skillz,proficiency,strong knowledge, narrow tolerances

things to consider with q points

when in doubt its a q


appropriate supervision


not tired



pen and ink changes to FWP's

Only for minor changes not affecting scopre or intent of FWP



who must approve pen and ink changes to OQE must be approved by who?

QAO/QAS or a QAI

what must be next to a pen and ink change?

approving authority/date/craftsman initial

quality assurance is defined as what?

a sysytematic review of Quality maintenance records which provide proof that work was preformed

what does waf stand for?

work requiring formal authorization

what does a MIC stand for and do?

Material id and control number (like a ssn)