Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
5 Cards in this Set
- Front
- Back
Which of the following is normally not one of the three parameters considered during tradeoffs?
A. Time B. Cost C. Performance D. Financial risks |
D. Financial risks
|
|
Which of the following generally gets reduced during tradeoffs?
A. Time B. Cost C. Performance D. Financial risks |
C. Performance
|
|
Which of the following is a human error / failure that can lead to tradeoffs?
A. Impossible schedule commitments B. Poor control of design changes C. Failure to receive approvals in a timely manner D. All of the above |
D. All of the above
|
|
The type of contract can influence the order of tradeoffs.
A. True B. False |
A. True
|
|
5. Cost and schedule overruns are generally caused by scope changes
A. True B. False |
A. True
|