• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/9

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

9 Cards in this Set

  • Front
  • Back

The British standard for hydrants

65mm round thread outlet


Minimum water flow rate of 2000 litres per minute at a minimum pressure of 1.7 bars


Anti-clockwise opening

Different types of hydrant plates

Standard hydrant plate


Directional hydrant plate


Double hydrant plate

How to read a hydrant plate

The top is the size of the main


The number on the bottom is the distance

What equipment makes up hydrant gear

Double headed standpipe


Hydrant bar


Hydrant key

The water supply system

Starts from reservoirs


Sent to treatment plants


Pumping station


Trunk mains


And service main

Procedure to setting into a hydrant

Removing hydrant cover


Connecting standpipe to outlet


Flushing the hydrant

Action to be taken when encountering a magnetic leak detection device

Does not need the hydrant valve to be opened for it to work . Can be removed safely and use the hydrant and reattach it when done

Actions to be taken when encountering a screw down detection device

The valve is left open ; when needed for operational use needs the valve to be shut off .


Unscrew valve and remove


Potential residual pressure


Once finished using it , do not reattach and leave it inside hydrant


Contact water office when returning to station

Hydrant testing

a visual inspection should be under taken yearly


All hydrants tested every four years - April to September