17 Cards in this Set

  • Front
  • Back

What is the purpose of RMD?

To provide special ship control and causaulty control procedures for use when the ship experiences an engineering casualty in restricted manuevering situation.

Who does the RMD provide guidance to?

Watch standers on the bridge and in engineering.


It deviates from normal EOCC procedures

When does a restricted manuevering situation occur?

In an environment where lost of propulsion, steering, or electrical power loss could immediately threaten the ships embarked aircraft, landing craft, or personnel.

In your own words what is RMD?

Engines and associated equipment will not be stopped in event of casualty. We will just keep going until failure of equipment.

Can you perform corrective maintenance in the plant while in RMD?

Not authorized while RMD is in effect.

How many mass casualty boxes are their?

4


Medical


Repair 2


Oil lab


Log room

What is head space timing?

It's Calibrating the weapon so it doesn't go off on and harm you or break the weapon.

What is endurance load?

Sustainability


45 days

Explain glide slope indicator

?

Explain what happens when a missle is inbound?

Slq will pick up on radar


Set general quarters


Try to evade incoming contact using nixie for torpedos


Use chaff and CIWS for missles


CiC Tao will take tactical command off fhe situation


DCA and XO will take charge of the damage control efforts.


Underway Checklist Nav/Admin

Delivery Underway checklist to NAV/Admin


Send Movrep


Test Nav lights


Conduct Nav Brief


Enter track data into ECDIS


Verify minimum expected depth posted at all fathometer locations


Inventory all bridge pubs


Bridge to bridge radio tuned and tested


Ensure aĺ electronic navigation Aids are energized and operating properly


Determine gyro error and post on repeaters and deck log


Post tides and currents on the bridge


Verify color guard is on station


Muster report delivered to XO


Inform OOD when demarcation line has been crossed

Engineering Underway checklist


Verify schedule for propulsion plant start up & Shore power to ship power shift.


Conduct steering checks


Energize and inspect electronic equipment IAW CSLO


Engage engine clutches and test for positive pitch control at EOSC / 1st LT


Energize deguassing and check coil settings


Top off fresh water tanks


Shift from shore to ship power


Energize and test SCC


Deliver draft report


Place CHT in transit mode


Disconnect hotel services and verify


Start both steering gear units


Request range run from deguassing control


Report zebra set


Operations Underway checklist

WSM request message from NIXIE.


Send opera clearance


Verify tugs, pilot, line handlers, Crane


Copy of comm plan to CIC bridge and CO


Com check on all sound powered phone circuit


Release oprep 5


Patch comm circuits


Conduct radio checks in CIC and on the bridge


Determine radar ranges and bearing errors posted on all repeaters


Conduct time check


Check site camera and allss


Set EMCOM condition


Disconnect ADP & BFTT connections


Deck underway checklist

SWO- Post watchbills


Rig Accommodation ladder


Test anchor windlass


Recover boats as directed


Retrive parking signs


Remove rat guards


Remove frap & wrap


Ensure paint barge is removed


Op test Capstans


Make ready lifeboats


Secure pilots ladder

Supply Underway checklist

Ascertain number of guest, eta, and berthing arrangements- CMAA


Have the word passed outgoing mail secure time


Turn in vehicles and report to CDO





Underway checklist OOD & CDO

Checklist posted on quarterdeck is being reviewed and signed


Pass the word to shift uniforms


Pass word to take garbage to the pier and brow will secure time


Station sea and anchor detail


Shift watch from quarterdeck to pilot house


OOD assume deck


Assure all shore cables are clear


Nav draft recorded in deck log


Verify hand helm comms with boat


Verify tug pilot arrangements


CDO request permission to get underway from ISIC


Pass the word to muster on station


Take in storm lines


Pass word for the ship expexts to get underway & submit muster reports


Conduct comm checks through sound powered phones


Recieve manned and ready reports from all controlling stations


Transfer steering from aft steering to the pilot house


Ensure call sign posted


Check harbor movements


Test general chemical collision alarm & ships whistle


If low vis set low visibility detail


Hold trash on station


Conn test rudder


Conn test scc alarms


JOOD Close up code hotel when pilot embarked


take in brow XO permission


Get permission from harbor control to get underway


Shift throttle control to SCC


Test pitch control


Report to XO when ready to get underway


Inspect weatherdeck for proper uniform CMAA


INFORM Main control 5min stand by to get underway


Single up all lines CO permission


Set restricted manuevering doctrine


Take in all lines when last line is clear pass underway shift colors


Haul down day shapes


Place life boats at the rail


Haul down code hotel when pilot debarks


Lower the pitsword


Once pass demarcation haul down call sign.


Secure from restricted manuevering










Esws program

Dec 1 1978


Adimiral T.B Hayward


He approved the enlisted program


Orginally required for officers with enlisted option.