Use LEFT and RIGHT arrow keys to navigate between flashcards;
Use UP and DOWN arrow keys to flip the card;
H to show hint;
A reads text to speech;
4 Cards in this Set
- Front
- Back
Discuss the purpose of the 3-M/PMS System. |
maintain equipment within specifications through preventive maintenance, identifying and correcting potential problems before the equipment or system becomes inoperable. |
|
Explain how Defense Property Accountability System (DPAS) is used to track equipment. |
track physical accountability of DoD property and provides data to the DON Financial Statements for inclusion into the Plant, Property, and Equipment (PP&E). |
|
Discuss the purpose of the Material Obligation Validation (MOV) program. |
DoD mandated program for all Services. This program is designed to validate unfilled orders assigned status codes. (navysup.navy.mil) |
|
Discuss the Depot Level Repairable (DLRs) program. |
program was established as a means of battling the ever increasing cost of repair parts for an array of technologically on ships and aircraft. |