• Shuffle
    Toggle On
    Toggle Off
  • Alphabetize
    Toggle On
    Toggle Off
  • Front First
    Toggle On
    Toggle Off
  • Both Sides
    Toggle On
    Toggle Off
  • Read
    Toggle On
    Toggle Off
Reading...
Front

Card Range To Study

through

image

Play button

image

Play button

image

Progress

1/4

Click to flip

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

4 Cards in this Set

  • Front
  • Back

Discuss the purpose of the 3-M/PMS System.

maintain equipment within specifications through preventive maintenance, identifying and correcting potential problems before the equipment or system becomes inoperable.

Explain how Defense Property Accountability System (DPAS) is used to track equipment.

track physical accountability of DoD property and provides data to the DON Financial Statements for inclusion into the Plant, Property, and Equipment (PP&E).

Discuss the purpose of the Material Obligation Validation (MOV) program.

DoD mandated program for all Services. This program is designed to validate unfilled orders assigned status codes. (navysup.navy.mil)

Discuss the Depot Level Repairable (DLRs) program.

program was established as a means of battling the ever increasing cost of repair parts for an array of technologically on ships and aircraft.