42 Cards in this Set

  • Front
  • Back
Type Commander (TYCOM)
Are responisble for ensuring the proper installation and operation of PMS within the ships under their command.
Commanding Officer (CO)
Ensuring ship maintenance is accouplished following 3M system and quality maintenance procedure and that the 3M system funstions effectively within the commence.
Executive Officer (XO)
3M Manager and is responisble to the CO for the overall management of the ships 3M system program.
3M System Coordinator (3MC)
The functional manager of the 3M system and is responsible to the XO for the coordination and direct supervision of all administrative facets of the ships 3M system program.
Department Head (HOD)
Supervise maintenance within the department and other departmenal 3M functions. Review and approve cycle and quarterly schedules.
D
Daily
2D
Every 2nd day
3D
Every 3rd day
W
Weekly
2W
Every 2 weeks
M
Monthly
2M
Every 2 months
Q
Quarterly
S
Semi-Annual
A
Annual
Non- Calendar Periodicity Codes:
R
Situation requirements (ex R-1)
Non- Calendar Periodicity Codes:
U
unscheduled maintenance
Inactive Equipment Maintenance (IEM):
LU
Lay-Up
Inactive Equipment Maintenance (IEM):
PM
Periodic maintenance
Inactive Equipment Maintenance (IEM):
SU
Start up (completed once, after removal from lay-up)
Inactive Equipment Maintenance (IEM):
OT
Operational Test
#
Mandatory
Rate Block
Is the recommended skill level needed to complete the maintenance requirement.
Color, location and purpose of the following maintenance cards:
White
Technically validated MRC located in the appropriate MRC deck, Provides detailed procedure for performing maintenance requirements that have been technically validated.
Color, location and purpose of the following maintenance cards:
Yellow
Preliminary, located in the appropriate MRC deck, provides detailed procedures for performing maintenance requirements that are undergoing final engineering validation
Color, location and purpose of the following maintenance cards:
Pink
classified, handled in accordance with department of the navy information security program regulations, OPNAVINST 5510.1
Validation of Materials:
LOEP to...
MIP
Validation of Materials:
MIP to....
MRC
Validation of Materials:
MRC to....
Equipment
Validation of Materials:
Equipment to....
EGL
Validation of Materials:
EGL to...
TGL
Validation of Materials:
TGL to....
Equipment
LOEP
List of effective pages
MIP
Consists of:
Maintenance index page
Syscom MIP control number
Syscom MRC control number
MRC
Maintenance Requirement card
SPMIG
Standard PMS material identification quide
HMUG
Hazardous material user's guide
MSDS
Material safety data sheet
FBR
Feed Back Report
EGL
Equipment guide list
PMS
Planned maintenance system
3M
maintenance and material management