Design-Build Advantages And Disadvantages

Decent Essays
Advantages:
1) Competition in pricing for general contract. As the name suggested, Design-Bid-Build asks general contractors to compete with each other based on the prices from subcontractors. Since this process involves biding and competing with other contractors, the owner may get the best price from Design-Bid-Build delivery method.
2) Theoretical price certainty from bid. Although general contractors put the bid document out to different subcontractors and ask them to bid on the subcomponents, the total price should fall in a certain range. The owner can get a theoretical price from the bid. Even if the owner changes his mind and chooses another delivery method, he can make budget based on the price.
Disadvantages:
1) Uncertainty of cost
…show more content…
Design-Build (3 points):
Advantages:
1) Sole source accountability. Design-Build is a delivery method that the design and construction services are contracted with a single company. It means if there are problems during the project, the owner does not to figure out which company needs to be responsible for the problems, because Design-Build has sole source accountability, and the owner can talk with the company immediately.
2) Less adversarial. Design-Build means less adversarial between architects and contractors, because there is only one contractor. The architects only need to communicate with the only one contractor every time. They only need to deal with the conflict between them. If there is more than one contractor, the contractors also have conflict with each other, and the architect needs to coordinate with all of them, which also wastes time and resources for the owner as well as for the contractor.
Disadvantages:
1) No outside monitoring construction. Since there is only one contractor, the owner does not have the third part to monitor outside the construction. Even the owner monitors the project by himself, problems and hazards may occur. If the owner finds the problem after the completion of the project, they need to spend more time and money to fix those
…show more content…
CM at risk with early contractor involvement (3 points):
Advantages:
1) Best team orientation. Construction Management at Risk requires the owner to choose a construction management firm. The firm will be the general contractor and manage the project during the construction phase. Since the construction managers in the firm have plenty experience, the team tend to be experienced and responsible. Construction Management at Risk has an orientation of best team.
2) Best arrangement for phased construction. Construction managers focus on management, and they can ask the subcontractors to take responsibilities to other parts of the project. Because of the experienced managers, the project can have best arrangement for phased construction, which saves resources and time for the owner.
Disadvantages:
1) Potential loss of price competition at Construction Management level. For the Construction Management at Risk delivery method, the owner and the construction management firm has settled the maximum price before the project, which means the owner loses potential price competition at construction management phase, and he does not know if he has got the best price for the

Related Documents

  • Improved Essays

    This case is a very good example of a good project management with high risk management. This case talks about the importance of project management process and risk management. Their approach to project management is bottom up, executive teams don’t tell project teams what to do, it project managers and project teams who provide project plans and analyse the risk and decide whether to do the project or not. Project teams take at least 6 months to bid for a RFP, and when they win the bid they know what they are going to do next. They are having a unique approach towards risk management and compliance process.…

    • 701 Words
    • 3 Pages
    Improved Essays
  • Superior Essays

    Advantages and Disadvantages of Contractors While…

    • 1257 Words
    • 6 Pages
    Superior Essays
  • Improved Essays

    A. Introduction The Trillium Health Centre(THC), as one of the largest community hospitals in Canada, plans to perform project involve work at Mississauga site and West Toronto site. The mission of THC team is to create an innovative kind of health care for a healthier community, which is the initiative of THC redevelopment project. The capital projects began in March 2006 and is to be finished in 2009. Overall, the hospital’s capacity will increase by 135 beds to 886 beds. The major change includes 206 Continuing Complex Services beds.…

    • 1123 Words
    • 5 Pages
    Improved Essays
  • Decent Essays

    According to Ferguson, (2010), a cost-plus contract does not require the same level of efficiency in cost. This will require the buyer to have very hands on approach on the project’s progression. Due to the many risk on the buyer it is imperative to review all contractor bidding cost to ensure accuracy and overall progression of the project. For example, in banking the first trade-off is cost due to the high demands on ethics of regulatory bodies; but retail or healthcare nonprofit performance is the first trade-off. (Kerzner, 2013).…

    • 299 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    Hsc300 Case Study

    • 483 Words
    • 2 Pages

    It helps the PM to foresee and prioritize a risk and its impact on the project. Hence, allowing the PM to formulate a plan for the seamless execution of the project.1,2 1. The mitigation plans for all the risks stated will be pragmatically approachable and…

    • 483 Words
    • 2 Pages
    Improved Essays
  • Decent Essays

    Escrow Cost Case Study

    • 462 Words
    • 2 Pages

    1) Escrow and legal costs. Escrow cost is required by law, and different states have different costs. When a project seeks a site, the clients need to think about escrow costs and make sure it is worthwhile to pay the amount of money. Besides escrow cost, there are also other kinds of legal and inevitable costs. These costs vary from locations and companies.…

    • 462 Words
    • 2 Pages
    Decent Essays
  • Improved Essays

    Archival (written) Through this process, I developed Ethical understanding capability where I identified ethical and unbiased information that is relevant to my research. I ensured the information I present this information in a factual manner, as this topic can be sensitive to people who contracted with this disease because for their experiences, such as how they lived with this disease and other problems they experienced (including the after-effects or the side-effects of the treatment). After reading and analysing sources, I developed my understanding more about bacterial meningitis and I was able to show its credibility by researching the background of the author. I have learned the methods used to diagnose bacterial meningitis in labs and the physical methods (i.e. performing lumbar puncture) to identify this disease. Now, I know the differences between these two methods.…

    • 954 Words
    • 4 Pages
    Improved Essays
  • Improved Essays

    E-Sourcing Case Study

    • 1048 Words
    • 5 Pages

    The Association for Healthcare Resource and Materials Management, the largest association of healthcare resource and material managers in the nation, hosted its annual conference in Boston, MA. Johns Hopkins Medicine announced, during the conference, that they were able to reduce their supply costs by $41 million dollars through “e-Sourcing.” While healthcare reform looks at ways to combat the high cost of healthcare supplies, Johns Hopkins initiated their own strategic sourcing strategy as a way to reduce costs and improve margins (Intesource, 2015/a: Johns Hopkins Medicine, 2014; Slocumb & Grant, 2011). Johns Hopkins negotiated significantly better contracts for medical equipment such as cardiac rhythm management devices and major radiology…

    • 1048 Words
    • 5 Pages
    Improved Essays
  • Great Essays

    A lot of things can go unexpectedly and could have a negative impact on the company o Contractor missing deadlines will cause a delays and additional costs o Forecasted sales for products could be inaccurate o Shortage in capital, man power and materials could have a negative impact on DSF • Financial risk – DSF is at high risk with this move. Within three years, the company has to spend over 25 million lbs. in new equipment. o DSF will most likely acquire debt for this initiative which could lead to negative consequences if construction plans delay  The organization image could be damage if they can’t meet supply  The alliance members such as banks and investors could also be negatively impacted • Operational risk - Risks that affects ongoing management process shouldn’t be affected.…

    • 993 Words
    • 4 Pages
    Great Essays
  • Improved Essays

    An important part of the communication between a contractor and homeowner is that they are on the same page when it comes to any changes in the plans. Every aspect of the building project should be discussed with the homeowner so that there are no misunderstandings. Warranties are essential for the homeowner. Make sure as you look for a home construction contractor that their work is under warranty.…

    • 455 Words
    • 2 Pages
    Improved Essays
  • Great Essays

    Briargrove Project Monitoring and Success Anthony Redhead Grantham University Project Management Integration Framework (BA 647) Introduction As the Briargrove Project has completed multiple phases within the corporate offices, it has finally addressed with success has locations around the world. Through project risk management, the Briargrove Project has identified risks and has assessed those risks to see which ones can be mitigated or corrected, and how to monitor them at the probability of occurrence. In the case of outsourcing resources, risk mitigation was used in order to look and review efficiency and cost of the services and equipment that has been outsourced. Briargrove has outsourced human capital, Information Technology…

    • 1617 Words
    • 7 Pages
    Great Essays
  • Improved Essays

    My career aspirations and enthusiasm toward Construction and Project Management have been highly influenced by my undergraduate study majoring in Civil Engineering. The undergraduate curriculum in Civil Engineering at NIT-Surat introduced me to a wide spectrum of subjects. But it was the field of Construction planning & Project Management which captured my interest and since then, I have started taking interest in this field. Later on I came to realize that to become an efficient & capable project manager in the Construction Industry, I should undertake training in individual areas construction world lacking in their academic background and maintain a equilibrium between all the necessary knowledge and technical skills which led me to pursue Masters in Civil Engineering in the area of Construction and Project Management at the University of British Columbia, Vancouver which is the center of excellence to study Construction and Project Management in the globe. During my study of Bachelor of Technology in Civil Engineering at the Sardar Patel National Institute of Technology, an Institute of National Importance declared by the Government of India in the field of Engineering and Technology, I understood that the roots of twentieth century project management are generally accepted as lying in…

    • 701 Words
    • 3 Pages
    Improved Essays
  • Improved Essays

    Identifying and managing risks is a critical responsibility of project managers. Risk is defined as the probability of a specified threat and the subsequent impact that the event produces (Vaidyanathan, 2013). Risks can also bring about either positive or negative outcomes for a project or organization. A project manager must identify potential risks and evaluate each one to determine the severity and likelihood of each event. Only by completing the risk management process, a project manager can determine what approach would work best to avoid, mitigate, and/or transfer the risk.…

    • 730 Words
    • 3 Pages
    Improved Essays
  • Great Essays

    Woody 2000 Case Study

    • 1292 Words
    • 6 Pages

    Each aspect during the designing, pre-construction, construction and post construction have made it flexible to modify and absorb any changes. The owners, vendors, regulatory authorities and third-parties are taken into consideration. The internal and external factors have been considered while developing the new project management plan. The design phase is adaptable and time flexible. Proper accountability and allocation has been done.…

    • 1292 Words
    • 6 Pages
    Great Essays
  • Great Essays

    CHAPTER 1: INTRODUCTION 1.0. INTRODUCTION This is the first chapter of the study and the researcher was focus on the following sections: background of the study, problem statement, research purpose, research objective, research question, scope of the study, significant of the study and the study of operational definitions. 1.1. RESEARCH BACKGROUND OF THE STUDY Construction industry sector is every nation’s economic development backbone but they are a mix of very complex processes that seldom go according to the planned schedule. Project implementation is the stage where all the planned activities are put in to action, the project is produced and the performance capabilities are verified.…

    • 1892 Words
    • 8 Pages
    Great Essays