The project’s footprint doesn’t allow for large scale material stockpiles, so many smaller deliveries get scheduled. Detailed locations for each shipment get coordinated and then the operator uses equipment to move materials around to the proper elements as needed. Stock piling materials for more than two days on the active side of the building regardless of …show more content…
Once those are ready, my time is free to make calls and schedule as needed without the distraction of walking paperwork around.
Corporate representatives in addition to the owner of the company, flew in last night for an 8:30am meeting this morning. In three week intervals, the principals meet on-site for a physical evaluation as opposed to the weekly conference call.
Marisa’s making her way into work from her Georgetown apartment, heading out on I-404/Rt. 9 and finally onto Rt.1 through the ‘5-points’ intersection. Exactly the main roads heading east/west to all the vacation areas along this coastal region. Depending on the time and day, this path becomes heavily congested from the intersection of Rt-1 and Rt-9 at the 5-point intersection all the way west to I-404 and I-50 intersection and beyond. Since I-50 is the only path out of the peninsula at that stage and everyone traveling home must cross the four mile long Chesapeake Bay Bridge, traffic backups occur from the bridge down I-50 and onto