The critical part of the construction process is to make sure the design that was tested, evaluated, and optimized matches the system being constructed (Blanchard). The Challenger space shuttle was constructed by its design fully. Due to its faulty design, the challenger was doomed to fail. The operational use and life cycle support process indicates how long this system, the space shuttle, will last since it will degrade through time, use, and exposure. Lastly, the system retirement and material disposal process indicates how the system will be dispose once it
The critical part of the construction process is to make sure the design that was tested, evaluated, and optimized matches the system being constructed (Blanchard). The Challenger space shuttle was constructed by its design fully. Due to its faulty design, the challenger was doomed to fail. The operational use and life cycle support process indicates how long this system, the space shuttle, will last since it will degrade through time, use, and exposure. Lastly, the system retirement and material disposal process indicates how the system will be dispose once it